Ada System

The Ada system includes a 130 mile natural gas gathering pipeline system connected to approximately 210 receipt points. Total throughput capacity of the system is approximately 80 MMcf/d.

Minden System

Our Minden processing plant includes a 115 MMcf/d cryogenic natural gas Processing plant. The plant includes an upstream natural gas gathering system of approximately 725 miles of pipeline with an estimated 400 plus receipt points. Throughput and processing capacity is approximately 115 MMcf/d.

Pelico Intrastate Pipeline

Our Pelico Intrastate Pipeline system is comprised of approximately 600 miles of intrastate natural gas gathering and transportation with an approximate throughput of 250 MMcf/d. Pelico manages connections to our Minden and Dubberly plants and receives natural gas from approximately 450 additional receipt points on the Pelico system. Pelico receives and delivers natural gas to multiple interconnects including interstate and intrastate pipelines and maintains direct connections to Industrial and utility end-use markets.