Date Requested: Oct 08 2025 4:28 PM
TGC Transactional Reporting Firm
TSP Name: Trunkline Gas Company, LLC (TSP: 007933062)
Posting Date | Posting Time | Svc Req K | Rate Sch | K Begin Date | K End Date | K Ent Begin Date/Time | K Ent End Date/Time | K Qty-K | Loc / QTI | K Stat | K Holder | K Holder Name | Affil | Res Rate ID | Max Tariff Res Rate | Res Rate Charged | Com Rate ID | Max Tariff Com Rate | Com Rate Charged | Negotiated Rate Indicator | Terms/Notes | Rec Loc | Rec Loc Ind | Rec Loc Zn | Rec Loc Name | Del Loc | Del Loc Ind | Del Loc Zn | Del Loc Name |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
10/01/2025 | 05:15AM | 12437 | SST | 09/01/1993 | 01/01/2200 | 09/01/1993 09:00AM | 01/02/2200 09:00AM | 10,350 | 3 | A | 026357020 | Hardeman-Fayette Utility District | None | RES | 0.000000 | 0.000000 | COM | 0.208000 | 0.208000 | No | 80070 | I | Z1A | DYERSBURG - OUTLET - TEXAS GAS | HARDM | I | Z1A | HARDEMAN - FAYETTE UTILITY DISTRICT | |
10/01/2025 | 05:15AM | 12437 | SST | 09/01/1993 | 01/01/2200 | 09/01/1993 09:00AM | 01/02/2200 09:00AM | 10,350 | 3 | A | 026357020 | Hardeman-Fayette Utility District | None | RES | 0.000000 | 0.000000 | COM | 0.413100 | 0.413100 | No | 81718 | I | FLD | LAKESIDE - NGPL | HARDM | I | Z1A | HARDEMAN - FAYETTE UTILITY DISTRICT | |
10/01/2025 | 05:15AM | 12437 | SST | 09/01/1993 | 01/01/2200 | 09/01/1993 09:00AM | 01/02/2200 09:00AM | 10,350 | 3 | A | 026357020 | Hardeman-Fayette Utility District | None | RES | 0.000000 | 0.000000 | COM | 0.413100 | 0.413100 | No | 82864 | I | FLD | NEPTUNE PLANT | HARDM | I | Z1A | HARDEMAN - FAYETTE UTILITY DISTRICT | |
10/01/2025 | 05:15AM | 12437 | SST | 09/01/1993 | 01/01/2200 | 09/01/1993 09:00AM | 01/02/2200 09:00AM | 10,350 | 3 | A | 026357020 | Hardeman-Fayette Utility District | None | RES | 0.000000 | 0.000000 | COM | 0.413100 | 0.413100 | No | 93072 | I | FLD | LA 1 STORAGE FIELD - ACCTG METER | HARDM | I | Z1A | HARDEMAN - FAYETTE UTILITY DISTRICT | |
10/01/2025 | 05:15AM | 12445 | SST | 09/01/1993 | 01/01/2200 | 09/01/1993 09:00AM | 01/02/2200 09:00AM | 4,500 | 3 | A | 081346520 | Town of Newbern, Tennessee | None | RES | 0.000000 | 0.000000 | COM | 0.479700 | 0.479700 | No | 81718 | I | FLD | LAKESIDE - NGPL | 80068 | I | Z1B | TOWN OF NEWBERN, TN | |
10/01/2025 | 05:15AM | 12445 | SST | 09/01/1993 | 01/01/2200 | 09/01/1993 09:00AM | 01/02/2200 09:00AM | 4,500 | 3 | A | 081346520 | Town of Newbern, Tennessee | None | RES | 0.000000 | 0.000000 | COM | 0.479700 | 0.479700 | No | 82864 | I | FLD | NEPTUNE PLANT | 80068 | I | Z1B | TOWN OF NEWBERN, TN | |
10/01/2025 | 05:15AM | 12445 | SST | 09/01/1993 | 01/01/2200 | 09/01/1993 09:00AM | 01/02/2200 09:00AM | 4,500 | 3 | A | 081346520 | Town of Newbern, Tennessee | None | RES | 0.000000 | 0.000000 | COM | 0.479700 | 0.479700 | No | 93072 | I | FLD | LA 1 STORAGE FIELD - ACCTG METER | 80068 | I | Z1B | TOWN OF NEWBERN, TN | |
09/05/2025 | 05:15AM | 24531 | FT | 09/01/2010 | 12/31/2026 | 09/01/2010 09:00AM | 01/01/2027 09:00AM | 336,000 | 3 | A | 117260420 | DCP South Central Texas, LLC | None | RES | 3.700100 | 1.659259 | COM | 0.003800 | 0.003800 | Yes | Effective 6/1/2024 - 12/31/2026 Discounted Secondary Receipt Point(s): South Texas Receipts (ST-MR). Discounted Secondary Delivery Point(s): South Texas Delivery Points (ST-MD). Effective 6/1/2024 - 7/31/2026 Demand Volumetric Rate: $0.0605. Effective 8/1/2026 - 12/31/2026 Demand Volumetric Rate: $0.0185. Shipper shall have three successive unilateral rights, at their sole option, to extend the term of the Transportation Agreement and this Negotiated Rate Agreement for an additional five years (the “Extension Option(s)”) at the then-current MDQ, the then-current Primary Receipt Point(s) and Primary Delivery Point(s), Secondary Receipt Points(s), and Secondary Delivery Points(s) and rates as specified below. Shipper may exercise its Extension Option(s) by giving written notice to Trunkline of such exercise at least three hundred sixty-six (366) days prior to the end of the then-current term. Each five-year extension shall be at the following rate(s): Effective for the year 2027, Daily Demand Rate: $0.0728/Dt/day and Demand Volumetric Rate: $0.0185; and effective beginning January 1, 2028, and continuing through the remaining term of the first Extension Option and any further Extension Option(s), Daily Demand Rate: $0.0603/Dt/day and Demand Volumetric Rate: $0.0185. | 82669 | I | FLD | RIVER RANCH INTERCONNECT - CHARRO OPERATING | 80727 | I | FLD | EAGLE PLANT INLET - TGC DELIVERY - DCP OPERATING |
09/05/2025 | 05:15AM | 24531 | FT | 09/01/2010 | 12/31/2026 | 09/01/2010 09:00AM | 01/01/2027 09:00AM | 336,000 | 3 | A | 117260420 | DCP South Central Texas, LLC | None | RES | 3.700100 | 1.659259 | COM | 0.003800 | 0.003800 | Yes | Effective 6/1/2024 - 12/31/2026 Discounted Secondary Receipt Point(s): South Texas Receipts (ST-MR). Discounted Secondary Delivery Point(s): South Texas Delivery Points (ST-MD). Effective 6/1/2024 - 7/31/2026 Demand Volumetric Rate: $0.0605. Effective 8/1/2026 - 12/31/2026 Demand Volumetric Rate: $0.0185. Shipper shall have three successive unilateral rights, at their sole option, to extend the term of the Transportation Agreement and this Negotiated Rate Agreement for an additional five years (the “Extension Option(s)”) at the then-current MDQ, the then-current Primary Receipt Point(s) and Primary Delivery Point(s), Secondary Receipt Points(s), and Secondary Delivery Points(s) and rates as specified below. Shipper may exercise its Extension Option(s) by giving written notice to Trunkline of such exercise at least three hundred sixty-six (366) days prior to the end of the then-current term. Each five-year extension shall be at the following rate(s): Effective for the year 2027, Daily Demand Rate: $0.0728/Dt/day and Demand Volumetric Rate: $0.0185; and effective beginning January 1, 2028, and continuing through the remaining term of the first Extension Option and any further Extension Option(s), Daily Demand Rate: $0.0603/Dt/day and Demand Volumetric Rate: $0.0185. | 82748 | I | FLD | CHRISTMAS LATERAL - DCP OPERATING | 80727 | I | FLD | EAGLE PLANT INLET - TGC DELIVERY - DCP OPERATING |
09/05/2025 | 05:15AM | 24531 | FT | 09/01/2010 | 12/31/2026 | 09/01/2010 09:00AM | 01/01/2027 09:00AM | 336,000 | 3 | A | 117260420 | DCP South Central Texas, LLC | None | RES | 3.700100 | 1.659259 | COM | 0.003800 | 0.003800 | Yes | Effective 6/1/2024 - 12/31/2026 Discounted Secondary Receipt Point(s): South Texas Receipts (ST-MR). Discounted Secondary Delivery Point(s): South Texas Delivery Points (ST-MD). Effective 6/1/2024 - 7/31/2026 Demand Volumetric Rate: $0.0605. Effective 8/1/2026 - 12/31/2026 Demand Volumetric Rate: $0.0185. Shipper shall have three successive unilateral rights, at their sole option, to extend the term of the Transportation Agreement and this Negotiated Rate Agreement for an additional five years (the “Extension Option(s)”) at the then-current MDQ, the then-current Primary Receipt Point(s) and Primary Delivery Point(s), Secondary Receipt Points(s), and Secondary Delivery Points(s) and rates as specified below. Shipper may exercise its Extension Option(s) by giving written notice to Trunkline of such exercise at least three hundred sixty-six (366) days prior to the end of the then-current term. Each five-year extension shall be at the following rate(s): Effective for the year 2027, Daily Demand Rate: $0.0728/Dt/day and Demand Volumetric Rate: $0.0185; and effective beginning January 1, 2028, and continuing through the remaining term of the first Extension Option and any further Extension Option(s), Daily Demand Rate: $0.0603/Dt/day and Demand Volumetric Rate: $0.0185. | 82751 | I | FLD | FINTEX - DCP OPERATING | 82753 | I | FLD | GULF PLAINS - DCP OPERATING |
09/05/2025 | 05:15AM | 24531 | FT | 09/01/2010 | 12/31/2026 | 09/01/2010 09:00AM | 01/01/2027 09:00AM | 336,000 | 3 | A | 117260420 | DCP South Central Texas, LLC | None | RES | 3.700100 | 1.659259 | COM | 0.003800 | 0.003800 | Yes | Effective 6/1/2024 - 12/31/2026 Discounted Secondary Receipt Point(s): South Texas Receipts (ST-MR). Discounted Secondary Delivery Point(s): South Texas Delivery Points (ST-MD). Effective 6/1/2024 - 7/31/2026 Demand Volumetric Rate: $0.0605. Effective 8/1/2026 - 12/31/2026 Demand Volumetric Rate: $0.0185. Shipper shall have three successive unilateral rights, at their sole option, to extend the term of the Transportation Agreement and this Negotiated Rate Agreement for an additional five years (the “Extension Option(s)”) at the then-current MDQ, the then-current Primary Receipt Point(s) and Primary Delivery Point(s), Secondary Receipt Points(s), and Secondary Delivery Points(s) and rates as specified below. Shipper may exercise its Extension Option(s) by giving written notice to Trunkline of such exercise at least three hundred sixty-six (366) days prior to the end of the then-current term. Each five-year extension shall be at the following rate(s): Effective for the year 2027, Daily Demand Rate: $0.0728/Dt/day and Demand Volumetric Rate: $0.0185; and effective beginning January 1, 2028, and continuing through the remaining term of the first Extension Option and any further Extension Option(s), Daily Demand Rate: $0.0603/Dt/day and Demand Volumetric Rate: $0.0185. | 82754 | I | FLD | BUTLER - DCP OPERATING | 80727 | I | FLD | EAGLE PLANT INLET - TGC DELIVERY - DCP OPERATING |
10/02/2025 | 05:15AM | 24531 | FT | 09/01/2010 | 12/31/2026 | 09/01/2010 09:00AM | 01/01/2027 09:00AM | 336,000 | 3 | A | 117260420 | DCP South Central Texas, LLC | None | RES | 3.700100 | 1.659259 | COM | 0.003900 | 0.003900 | Yes | Effective 6/1/2024 - 12/31/2026 Discounted Secondary Receipt Point(s): South Texas Receipts (ST-MR). Discounted Secondary Delivery Point(s): South Texas Delivery Points (ST-MD). Effective 6/1/2024 - 7/31/2026 Demand Volumetric Rate: $0.0605. Effective 8/1/2026 - 12/31/2026 Demand Volumetric Rate: $0.0185. Shipper shall have three successive unilateral rights, at their sole option, to extend the term of the Transportation Agreement and this Negotiated Rate Agreement for an additional five years (the “Extension Option(s)”) at the then-current MDQ, the then-current Primary Receipt Point(s) and Primary Delivery Point(s), Secondary Receipt Points(s), and Secondary Delivery Points(s) and rates as specified below. Shipper may exercise its Extension Option(s) by giving written notice to Trunkline of such exercise at least three hundred sixty-six (366) days prior to the end of the then-current term. Each five-year extension shall be at the following rate(s): Effective for the year 2027, Daily Demand Rate: $0.0728/Dt/day and Demand Volumetric Rate: $0.0185; and effective beginning January 1, 2028, and continuing through the remaining term of the first Extension Option and any further Extension Option(s), Daily Demand Rate: $0.0603/Dt/day and Demand Volumetric Rate: $0.0185. | 81570 | I | FLD | TURKEY CREEK - PETROLEUM FUELS | 80727 | I | FLD | EAGLE PLANT INLET - TGC DELIVERY - DCP OPERATING |
10/02/2025 | 05:15AM | 24531 | FT | 09/01/2010 | 12/31/2026 | 09/01/2010 09:00AM | 01/01/2027 09:00AM | 336,000 | 3 | A | 117260420 | DCP South Central Texas, LLC | None | RES | 3.700100 | 1.659259 | COM | 0.003900 | 0.003900 | Yes | Effective 6/1/2024 - 12/31/2026 Discounted Secondary Receipt Point(s): South Texas Receipts (ST-MR). Discounted Secondary Delivery Point(s): South Texas Delivery Points (ST-MD). Effective 6/1/2024 - 7/31/2026 Demand Volumetric Rate: $0.0605. Effective 8/1/2026 - 12/31/2026 Demand Volumetric Rate: $0.0185. Shipper shall have three successive unilateral rights, at their sole option, to extend the term of the Transportation Agreement and this Negotiated Rate Agreement for an additional five years (the “Extension Option(s)”) at the then-current MDQ, the then-current Primary Receipt Point(s) and Primary Delivery Point(s), Secondary Receipt Points(s), and Secondary Delivery Points(s) and rates as specified below. Shipper may exercise its Extension Option(s) by giving written notice to Trunkline of such exercise at least three hundred sixty-six (366) days prior to the end of the then-current term. Each five-year extension shall be at the following rate(s): Effective for the year 2027, Daily Demand Rate: $0.0728/Dt/day and Demand Volumetric Rate: $0.0185; and effective beginning January 1, 2028, and continuing through the remaining term of the first Extension Option and any further Extension Option(s), Daily Demand Rate: $0.0603/Dt/day and Demand Volumetric Rate: $0.0185. | 82669 | I | FLD | RIVER RANCH INTERCONNECT - CHARRO OPERATING | 80727 | I | FLD | EAGLE PLANT INLET - TGC DELIVERY - DCP OPERATING |
10/02/2025 | 05:15AM | 24531 | FT | 09/01/2010 | 12/31/2026 | 09/01/2010 09:00AM | 01/01/2027 09:00AM | 336,000 | 3 | A | 117260420 | DCP South Central Texas, LLC | None | RES | 3.700100 | 1.659259 | COM | 0.003900 | 0.003900 | Yes | Effective 6/1/2024 - 12/31/2026 Discounted Secondary Receipt Point(s): South Texas Receipts (ST-MR). Discounted Secondary Delivery Point(s): South Texas Delivery Points (ST-MD). Effective 6/1/2024 - 7/31/2026 Demand Volumetric Rate: $0.0605. Effective 8/1/2026 - 12/31/2026 Demand Volumetric Rate: $0.0185. Shipper shall have three successive unilateral rights, at their sole option, to extend the term of the Transportation Agreement and this Negotiated Rate Agreement for an additional five years (the “Extension Option(s)”) at the then-current MDQ, the then-current Primary Receipt Point(s) and Primary Delivery Point(s), Secondary Receipt Points(s), and Secondary Delivery Points(s) and rates as specified below. Shipper may exercise its Extension Option(s) by giving written notice to Trunkline of such exercise at least three hundred sixty-six (366) days prior to the end of the then-current term. Each five-year extension shall be at the following rate(s): Effective for the year 2027, Daily Demand Rate: $0.0728/Dt/day and Demand Volumetric Rate: $0.0185; and effective beginning January 1, 2028, and continuing through the remaining term of the first Extension Option and any further Extension Option(s), Daily Demand Rate: $0.0603/Dt/day and Demand Volumetric Rate: $0.0185. | 82748 | I | FLD | CHRISTMAS LATERAL - DCP OPERATING | 80727 | I | FLD | EAGLE PLANT INLET - TGC DELIVERY - DCP OPERATING |
10/02/2025 | 05:15AM | 24531 | FT | 09/01/2010 | 12/31/2026 | 09/01/2010 09:00AM | 01/01/2027 09:00AM | 336,000 | 3 | A | 117260420 | DCP South Central Texas, LLC | None | RES | 3.700100 | 1.659259 | COM | 0.003900 | 0.003900 | Yes | Effective 6/1/2024 - 12/31/2026 Discounted Secondary Receipt Point(s): South Texas Receipts (ST-MR). Discounted Secondary Delivery Point(s): South Texas Delivery Points (ST-MD). Effective 6/1/2024 - 7/31/2026 Demand Volumetric Rate: $0.0605. Effective 8/1/2026 - 12/31/2026 Demand Volumetric Rate: $0.0185. Shipper shall have three successive unilateral rights, at their sole option, to extend the term of the Transportation Agreement and this Negotiated Rate Agreement for an additional five years (the “Extension Option(s)”) at the then-current MDQ, the then-current Primary Receipt Point(s) and Primary Delivery Point(s), Secondary Receipt Points(s), and Secondary Delivery Points(s) and rates as specified below. Shipper may exercise its Extension Option(s) by giving written notice to Trunkline of such exercise at least three hundred sixty-six (366) days prior to the end of the then-current term. Each five-year extension shall be at the following rate(s): Effective for the year 2027, Daily Demand Rate: $0.0728/Dt/day and Demand Volumetric Rate: $0.0185; and effective beginning January 1, 2028, and continuing through the remaining term of the first Extension Option and any further Extension Option(s), Daily Demand Rate: $0.0603/Dt/day and Demand Volumetric Rate: $0.0185. | 82751 | I | FLD | FINTEX - DCP OPERATING | 82753 | I | FLD | GULF PLAINS - DCP OPERATING |
10/02/2025 | 05:15AM | 24531 | FT | 09/01/2010 | 12/31/2026 | 09/01/2010 09:00AM | 01/01/2027 09:00AM | 336,000 | 3 | A | 117260420 | DCP South Central Texas, LLC | None | RES | 3.700100 | 1.659259 | COM | 0.003900 | 0.003900 | Yes | Effective 6/1/2024 - 12/31/2026 Discounted Secondary Receipt Point(s): South Texas Receipts (ST-MR). Discounted Secondary Delivery Point(s): South Texas Delivery Points (ST-MD). Effective 6/1/2024 - 7/31/2026 Demand Volumetric Rate: $0.0605. Effective 8/1/2026 - 12/31/2026 Demand Volumetric Rate: $0.0185. Shipper shall have three successive unilateral rights, at their sole option, to extend the term of the Transportation Agreement and this Negotiated Rate Agreement for an additional five years (the “Extension Option(s)”) at the then-current MDQ, the then-current Primary Receipt Point(s) and Primary Delivery Point(s), Secondary Receipt Points(s), and Secondary Delivery Points(s) and rates as specified below. Shipper may exercise its Extension Option(s) by giving written notice to Trunkline of such exercise at least three hundred sixty-six (366) days prior to the end of the then-current term. Each five-year extension shall be at the following rate(s): Effective for the year 2027, Daily Demand Rate: $0.0728/Dt/day and Demand Volumetric Rate: $0.0185; and effective beginning January 1, 2028, and continuing through the remaining term of the first Extension Option and any further Extension Option(s), Daily Demand Rate: $0.0603/Dt/day and Demand Volumetric Rate: $0.0185. | 82754 | I | FLD | BUTLER - DCP OPERATING | 80727 | I | FLD | EAGLE PLANT INLET - TGC DELIVERY - DCP OPERATING |
10/01/2025 | 05:15AM | 31778 | EFT | 04/01/2016 | 03/31/2026 | 04/01/2016 09:00AM | 04/01/2026 09:00AM | 5,875 | 3 | A | 119375212 | Delta South Louisiana Company, LLC | None | RES | 7.974500 | 7.974500 | COM | 0.009400 | 0.009400 | No | 82747 | I | Z1A | FAYETTEVILLE @ BOBO ROAD - FAYETTEVILLE EXPRESS PIPELINE | DUSLA | I | FLD | DELTA UTILITIES LOUISIANA | |
07/30/2025 | 05:16AM | 35867 | EFT | 11/01/2020 | 10/31/2028 | 11/01/2020 09:00AM | 11/01/2028 09:00AM | 4,000 | 3 | A | 006948210 | CenterPoint Energy Resources Corp. | None | RES | 4.306300 | 4.306300 | COM | 0.003800 | 0.003800 | No | 80758 | I | FLD | TRUNKLINE-MATTERHORN INTERCONNECT | CPNTX | I | FLD | Centerpoint North Texas | |
07/30/2025 | 05:16AM | 35867 | EFT | 11/01/2020 | 10/31/2028 | 11/01/2020 09:00AM | 11/01/2028 09:00AM | 4,000 | 3 | A | 006948210 | CenterPoint Energy Resources Corp. | None | RES | 7.974500 | 7.974500 | COM | 0.009300 | 0.009300 | No | 82747 | I | Z1A | FAYETTEVILLE @ BOBO ROAD - FAYETTEVILLE EXPRESS PIPELINE | CPNTX | I | FLD | Centerpoint North Texas | |
07/30/2025 | 05:16AM | 35867 | EFT | 11/01/2020 | 10/31/2028 | 11/01/2020 09:00AM | 11/01/2028 09:00AM | 4,000 | 3 | A | 006948210 | CenterPoint Energy Resources Corp. | None | RES | 4.306300 | 4.306300 | COM | 0.003800 | 0.003800 | No | 82864 | I | FLD | NEPTUNE PLANT | CPNTX | I | FLD | Centerpoint North Texas | |
07/30/2025 | 05:16AM | 35867 | EFT | 11/01/2020 | 10/31/2028 | 11/01/2020 09:00AM | 11/01/2028 09:00AM | 4,000 | 3 | A | 006948210 | CenterPoint Energy Resources Corp. | None | RES | 4.306300 | 4.306300 | COM | 0.003800 | 0.003800 | No | 83033 | I | FLD | PATTERSON II PLANT | CPNTX | I | FLD | Centerpoint North Texas | |
10/01/2025 | 06:54AM | 37796 | FT | 04/01/2023 | 03/31/2035 | 04/01/2023 09:00AM | 04/01/2035 09:00AM | 225,000 | 3 | A | 006922371 | Florida Power & Light Company | None | RES | 3.700100 | 24.181250 | COM | 0.003900 | 0.009600 | Yes | Secondary Receipt Point(s) during the Primary Term: Regency Waha (Meter No. 4663), RBX/Oasis Waha (Meter No. 485200-O), Oneok Waha [Meter No. 5896A), Atmos Oasis/Atmos PL-Waha (Meter No. 1229A), Enterprise Texas Pipeline (Meter No. 1265A), Oasis GCX (Meter No. 5895A), Aqua Blanca/Oasis-Pecos (Meter No. 5897A), Waha Hub (Meter No. 9019), El Paso Waha (Meter No. 6541 & 6541A), Northern Waha (Meter No. 8724), Transwestern (Meter No.6301), Rebel Tailgate to NTP (Meter No. 533510), Rebel II Residue to NTP(Meter No. 533511), Panther Tailgate to NTP (Meter No. 533515), ETC Panther II Receipt (Meter No. 533516), Gulf Run secondary receipt points, Trunkline Field Zone secondary receipt points. Secondary Delivery Points during the Primary Term: HPL/Gulf South-Carthage (Meter No. 980489), HPL/NGPL - Carthage (delivery) (Meter No. 980488), HPL/Eastrans-Carthage (Meter No. 980495A), HPL/Tiger-Panola Group (Meter No. 980036), Maypearl (Meter No. 100400), HPL East TX Hub Meter (Meter No. 988496), all points in Gulf Run Zone 2 and Trunkline Field Zone. | 9019 | I | FLD | Waha Hub | 82503 | I | FLD | FLORIDA - TGC INTERCONNECT - MANCHESTER |
10/01/2025 | 06:54AM | 37796 | FT | 04/01/2023 | 03/31/2035 | 04/01/2023 09:00AM | 04/01/2035 09:00AM | 225,000 | 3 | A | 006922371 | Florida Power & Light Company | None | RES | 3.700100 | 24.181250 | COM | 0.003900 | 0.009600 | Yes | Secondary Receipt Point(s) during the Primary Term: Regency Waha (Meter No. 4663), RBX/Oasis Waha (Meter No. 485200-O), Oneok Waha [Meter No. 5896A), Atmos Oasis/Atmos PL-Waha (Meter No. 1229A), Enterprise Texas Pipeline (Meter No. 1265A), Oasis GCX (Meter No. 5895A), Aqua Blanca/Oasis-Pecos (Meter No. 5897A), Waha Hub (Meter No. 9019), El Paso Waha (Meter No. 6541 & 6541A), Northern Waha (Meter No. 8724), Transwestern (Meter No.6301), Rebel Tailgate to NTP (Meter No. 533510), Rebel II Residue to NTP(Meter No. 533511), Panther Tailgate to NTP (Meter No. 533515), ETC Panther II Receipt (Meter No. 533516), Gulf Run secondary receipt points, Trunkline Field Zone secondary receipt points. Secondary Delivery Points during the Primary Term: HPL/Gulf South-Carthage (Meter No. 980489), HPL/NGPL - Carthage (delivery) (Meter No. 980488), HPL/Eastrans-Carthage (Meter No. 980495A), HPL/Tiger-Panola Group (Meter No. 980036), Maypearl (Meter No. 100400), HPL East TX Hub Meter (Meter No. 988496), all points in Gulf Run Zone 2 and Trunkline Field Zone. | 9019 | I | FLD | Waha Hub | 82708 | I | FLD | FLORIDA - TGC INTERCONNECT - VERMILION |
10/01/2025 | 06:54AM | 37796 | FT | 04/01/2023 | 03/31/2035 | 04/01/2023 09:00AM | 04/01/2035 09:00AM | 225,000 | 3 | A | 006922371 | Florida Power & Light Company | None | RES | 3.700100 | 24.181250 | COM | 0.003900 | 0.009600 | Yes | Secondary Receipt Point(s) during the Primary Term: Regency Waha (Meter No. 4663), RBX/Oasis Waha (Meter No. 485200-O), Oneok Waha [Meter No. 5896A), Atmos Oasis/Atmos PL-Waha (Meter No. 1229A), Enterprise Texas Pipeline (Meter No. 1265A), Oasis GCX (Meter No. 5895A), Aqua Blanca/Oasis-Pecos (Meter No. 5897A), Waha Hub (Meter No. 9019), El Paso Waha (Meter No. 6541 & 6541A), Northern Waha (Meter No. 8724), Transwestern (Meter No.6301), Rebel Tailgate to NTP (Meter No. 533510), Rebel II Residue to NTP(Meter No. 533511), Panther Tailgate to NTP (Meter No. 533515), ETC Panther II Receipt (Meter No. 533516), Gulf Run secondary receipt points, Trunkline Field Zone secondary receipt points. Secondary Delivery Points during the Primary Term: HPL/Gulf South-Carthage (Meter No. 980489), HPL/NGPL - Carthage (delivery) (Meter No. 980488), HPL/Eastrans-Carthage (Meter No. 980495A), HPL/Tiger-Panola Group (Meter No. 980036), Maypearl (Meter No. 100400), HPL East TX Hub Meter (Meter No. 988496), all points in Gulf Run Zone 2 and Trunkline Field Zone. | 9019 | I | FLD | Waha Hub | 82877 | I | FLD | FLORIDA - TGC INTERCONNECT - GILLIS |
10/01/2025 | 06:54AM | 37796 | FT | 04/01/2023 | 03/31/2035 | 04/01/2023 09:00AM | 04/01/2035 09:00AM | 225,000 | 3 | A | 006922371 | Florida Power & Light Company | None | RES | 3.700100 | 20.379166 | COM | 0.003900 | 0.009600 | Yes | Secondary Receipt Point(s) during the Primary Term: Regency Waha (Meter No. 4663), RBX/Oasis Waha (Meter No. 485200-O), Oneok Waha [Meter No. 5896A), Atmos Oasis/Atmos PL-Waha (Meter No. 1229A), Enterprise Texas Pipeline (Meter No. 1265A), Oasis GCX (Meter No. 5895A), Aqua Blanca/Oasis-Pecos (Meter No. 5897A), Waha Hub (Meter No. 9019), El Paso Waha (Meter No. 6541 & 6541A), Northern Waha (Meter No. 8724), Transwestern (Meter No.6301), Rebel Tailgate to NTP (Meter No. 533510), Rebel II Residue to NTP(Meter No. 533511), Panther Tailgate to NTP (Meter No. 533515), ETC Panther II Receipt (Meter No. 533516), Gulf Run secondary receipt points, Trunkline Field Zone secondary receipt points. Secondary Delivery Points during the Primary Term: HPL/Gulf South-Carthage (Meter No. 980489), HPL/NGPL - Carthage (delivery) (Meter No. 980488), HPL/Eastrans-Carthage (Meter No. 980495A), HPL/Tiger-Panola Group (Meter No. 980036), Maypearl (Meter No. 100400), HPL East TX Hub Meter (Meter No. 988496), all points in Gulf Run Zone 2 and Trunkline Field Zone. | 9019 | I | FLD | Waha Hub | 981446 | I | FLD | HPL/FGT Vidor |
10/01/2025 | 06:58AM | 38446 | FT | 09/01/2024 | 08/31/2027 | 09/01/2024 09:00AM | 09/01/2027 09:00AM | 25,161 | 3 | A | 006924286 | Tampa Electric Company | None | RES | 3.700100 | 24.181250 | COM | 0.003900 | 0.016400 | Yes | Negotiated Rate Parameters: Secondary Receipt Point(s): Regency Waha (Meter No. 4663), RBX/Oasis Waha (Meter No. 485200-0), Oneok Waha (Meter No. 5896A), Atmos Oasis/Atmos PL-Waha (Meter No. 1229A), Enterprise Texas Pipeline (Meter No. 1265A), Oasis GCX (Meter No. 5895A), Aqua Blanca/Oasis-Pecos (Meter No. 5897A), Waha Hub (Meter No. 9019), El Paso Waha (Meter No. 6541 & 6541A), Northern Waha (Meter No. 8724A), Transwestern (Meter No. 6301A), Rebel Tailgate to NTP (Meter No. 533510), Rebel II Residue to NTP (Meter No. 533511), Panther Tailgate to NTP (Meter No. 533515), ETC Panther II Receipt (Meter No. 533516), Tiger secondary receipt points, Trunkline Field Zone secondary receipt points. Secondary Delivery Point(s): HPL/Gulf South-Carthage (Meter No. 980489), HPL/NGPL- Carthage (delivery) (Meter No. 980488), HPL/Eastrans-Carthage (Meter No. 980495A), HPL/Tiger-Panola Group (Meter No. 980036), Maypearl (Meter No. 100400), HPL East Tx Hub Meter (Meter No. 988496), all Tiger secondary delivery points and Trunkline Field Zone secondary delivery points. | 533510 | I | FLD | Rebel Tailgate to NTP | 82503 | I | FLD | FLORIDA - TGC INTERCONNECT - MANCHESTER |
10/01/2025 | 06:58AM | 38446 | FT | 09/01/2024 | 08/31/2027 | 09/01/2024 09:00AM | 09/01/2027 09:00AM | 25,161 | 3 | A | 006924286 | Tampa Electric Company | None | RES | 3.700100 | 24.181250 | COM | 0.003900 | 0.016400 | Yes | Negotiated Rate Parameters: Secondary Receipt Point(s): Regency Waha (Meter No. 4663), RBX/Oasis Waha (Meter No. 485200-0), Oneok Waha (Meter No. 5896A), Atmos Oasis/Atmos PL-Waha (Meter No. 1229A), Enterprise Texas Pipeline (Meter No. 1265A), Oasis GCX (Meter No. 5895A), Aqua Blanca/Oasis-Pecos (Meter No. 5897A), Waha Hub (Meter No. 9019), El Paso Waha (Meter No. 6541 & 6541A), Northern Waha (Meter No. 8724A), Transwestern (Meter No. 6301A), Rebel Tailgate to NTP (Meter No. 533510), Rebel II Residue to NTP (Meter No. 533511), Panther Tailgate to NTP (Meter No. 533515), ETC Panther II Receipt (Meter No. 533516), Tiger secondary receipt points, Trunkline Field Zone secondary receipt points. Secondary Delivery Point(s): HPL/Gulf South-Carthage (Meter No. 980489), HPL/NGPL- Carthage (delivery) (Meter No. 980488), HPL/Eastrans-Carthage (Meter No. 980495A), HPL/Tiger-Panola Group (Meter No. 980036), Maypearl (Meter No. 100400), HPL East Tx Hub Meter (Meter No. 988496), all Tiger secondary delivery points and Trunkline Field Zone secondary delivery points. | 533511 | I | FLD | Rebel II Residue to NTP | 82503 | I | FLD | FLORIDA - TGC INTERCONNECT - MANCHESTER |
10/01/2025 | 06:58AM | 38446 | FT | 09/01/2024 | 08/31/2027 | 09/01/2024 09:00AM | 09/01/2027 09:00AM | 25,161 | 3 | A | 006924286 | Tampa Electric Company | None | RES | 3.700100 | 24.181250 | COM | 0.003900 | 0.016400 | Yes | Negotiated Rate Parameters: Secondary Receipt Point(s): Regency Waha (Meter No. 4663), RBX/Oasis Waha (Meter No. 485200-0), Oneok Waha (Meter No. 5896A), Atmos Oasis/Atmos PL-Waha (Meter No. 1229A), Enterprise Texas Pipeline (Meter No. 1265A), Oasis GCX (Meter No. 5895A), Aqua Blanca/Oasis-Pecos (Meter No. 5897A), Waha Hub (Meter No. 9019), El Paso Waha (Meter No. 6541 & 6541A), Northern Waha (Meter No. 8724A), Transwestern (Meter No. 6301A), Rebel Tailgate to NTP (Meter No. 533510), Rebel II Residue to NTP (Meter No. 533511), Panther Tailgate to NTP (Meter No. 533515), ETC Panther II Receipt (Meter No. 533516), Tiger secondary receipt points, Trunkline Field Zone secondary receipt points. Secondary Delivery Point(s): HPL/Gulf South-Carthage (Meter No. 980489), HPL/NGPL- Carthage (delivery) (Meter No. 980488), HPL/Eastrans-Carthage (Meter No. 980495A), HPL/Tiger-Panola Group (Meter No. 980036), Maypearl (Meter No. 100400), HPL East Tx Hub Meter (Meter No. 988496), all Tiger secondary delivery points and Trunkline Field Zone secondary delivery points. | 533515 | I | FLD | Panther Tailgate to NTP | 82503 | I | FLD | FLORIDA - TGC INTERCONNECT - MANCHESTER |
10/01/2025 | 06:58AM | 38446 | FT | 09/01/2024 | 08/31/2027 | 09/01/2024 09:00AM | 09/01/2027 09:00AM | 25,161 | 3 | A | 006924286 | Tampa Electric Company | None | RES | 3.700100 | 24.181250 | COM | 0.003900 | 0.016400 | Yes | Negotiated Rate Parameters: Secondary Receipt Point(s): Regency Waha (Meter No. 4663), RBX/Oasis Waha (Meter No. 485200-0), Oneok Waha (Meter No. 5896A), Atmos Oasis/Atmos PL-Waha (Meter No. 1229A), Enterprise Texas Pipeline (Meter No. 1265A), Oasis GCX (Meter No. 5895A), Aqua Blanca/Oasis-Pecos (Meter No. 5897A), Waha Hub (Meter No. 9019), El Paso Waha (Meter No. 6541 & 6541A), Northern Waha (Meter No. 8724A), Transwestern (Meter No. 6301A), Rebel Tailgate to NTP (Meter No. 533510), Rebel II Residue to NTP (Meter No. 533511), Panther Tailgate to NTP (Meter No. 533515), ETC Panther II Receipt (Meter No. 533516), Tiger secondary receipt points, Trunkline Field Zone secondary receipt points. Secondary Delivery Point(s): HPL/Gulf South-Carthage (Meter No. 980489), HPL/NGPL- Carthage (delivery) (Meter No. 980488), HPL/Eastrans-Carthage (Meter No. 980495A), HPL/Tiger-Panola Group (Meter No. 980036), Maypearl (Meter No. 100400), HPL East Tx Hub Meter (Meter No. 988496), all Tiger secondary delivery points and Trunkline Field Zone secondary delivery points. | 533516 | I | FLD | ETC Panther II Receipt | 82503 | I | FLD | FLORIDA - TGC INTERCONNECT - MANCHESTER |
10/01/2025 | 06:58AM | 38446 | FT | 09/01/2024 | 08/31/2027 | 09/01/2024 09:00AM | 09/01/2027 09:00AM | 25,161 | 3 | A | 006924286 | Tampa Electric Company | None | RES | 3.700100 | 24.181250 | COM | 0.003900 | 0.016400 | Yes | Negotiated Rate Parameters: Secondary Receipt Point(s): Regency Waha (Meter No. 4663), RBX/Oasis Waha (Meter No. 485200-0), Oneok Waha (Meter No. 5896A), Atmos Oasis/Atmos PL-Waha (Meter No. 1229A), Enterprise Texas Pipeline (Meter No. 1265A), Oasis GCX (Meter No. 5895A), Aqua Blanca/Oasis-Pecos (Meter No. 5897A), Waha Hub (Meter No. 9019), El Paso Waha (Meter No. 6541 & 6541A), Northern Waha (Meter No. 8724A), Transwestern (Meter No. 6301A), Rebel Tailgate to NTP (Meter No. 533510), Rebel II Residue to NTP (Meter No. 533511), Panther Tailgate to NTP (Meter No. 533515), ETC Panther II Receipt (Meter No. 533516), Tiger secondary receipt points, Trunkline Field Zone secondary receipt points. Secondary Delivery Point(s): HPL/Gulf South-Carthage (Meter No. 980489), HPL/NGPL- Carthage (delivery) (Meter No. 980488), HPL/Eastrans-Carthage (Meter No. 980495A), HPL/Tiger-Panola Group (Meter No. 980036), Maypearl (Meter No. 100400), HPL East Tx Hub Meter (Meter No. 988496), all Tiger secondary delivery points and Trunkline Field Zone secondary delivery points. | 533516 | I | FLD | ETC Panther II Receipt | 82708 | I | FLD | FLORIDA - TGC INTERCONNECT - VERMILION |