TSP Name: ENABLE MISSISSIPPI RIVER TRANSMISSION, LLC
TSP: 00-696-8077
Amend Rptg Desc: All Data
Svc Req K: 3228
K Holder Name: UNITED STATES STEEL CORPORATION
K Holder: 002 02 8801
Affil Desc: NONE
Tracking No: 0004652
K Stat: A Post Date: 5/6/2022 Post Time: 0948093
K Qty-K: 6173 Contract Duration Contract Entitlement
IT Qty-K: 0 K Beg Date K End Date K Ent Beg Date K Ent Beg Time
K Roll: Y 5/16/2002 4/30/2024 8/1/2022 0900000
Min Vol Qty - Non-Cap Rel: K Ent End Date K Ent End Time
Min Vol Pct - Non-Cap Rel: 0.00 5/1/2024 0859000
Cap Type Name: Primary Transaction Term Begin Date Transaction Term End Date:
8/1/2022 4/30/2024
Loc Purp
Loc Zn Loc Loc Name Desc
------- ------ ------------------------- -----------------------------------------------------------------
Field Field
Field Field
Loc K Max Press: Loc K Min Press:
K Qty - Loc: It Qty - Loc:
Field 805547 GLENDALE - EGT FLD RCPT Receipt Location
Field 805607 STORAGE Delivery Location
Loc K Max Press: Loc K Min Press:
K Qty - Loc: 6173 It Qty - Loc:
Rate Sch: FTS
Seasnl St: 0/0/0
Seasnl End: 0/0/0
Rpt Lvl Desc: Point
Res Rate Basis Desc: Per Day
Rate Form/Type Desc: Blended Rate(combination of reservation and volumetric charges)
Rate
Rate Chgd Max Trf Max Trf Rate Ngtd Rate Mkt Based
Chgd Ref Rate Ref Desc Ind Desc Rate Ind Disc Beg Date Disc End Date
--------- --- ------- -------------- --------- --------- ------------- -------------
00.072900 Max 0.0729 Tariff No N
Loc/QTI Desc: Receipt point(s) to delivery point(s) quantity
Rate ID: 141
Surchg ID Desc: Annual Charge Adjustment
Surchg Ind Desc:
Rate(s) stated do not include any applicable surcharges; surcharge detail and surcharge total provided
Tot Surchg: 0.00120
Terms/Notes:
Rate Charged and Maximum Tariff Rate (Max Trf Rate) are shown as unit
rate on an assumed 100% load factor basis.
Contract Duration shall continue from year to year after Contract
Duration End Date unless and until terminated by either MRT or
Customer by written notice to the other delivered at least six (6)
calendar months prior to the Contract Duration End Date or the
same date the next succeeding year.
Primary Path
From: #805547 Glendale - EGT Fld Rcpt
To: #805607 Storage
Line Capacities and Line Priorities applicable
services provided under this Agreement shall be
determined pursuant to the provisions of MRT's
Tariff (currently set forth at GT&C Section 8.2(b)),
as subsequently amended and in effect from time to time.
Pursuant to Section 15.3, GT&C of MRT's Tariff,
the parties agree that Customer shall have a
Right of First Refusal ("ROFR"). If Customer
chooses to exercise its ROFR, it shall do so by
following the procedures applicable to the exercise
of a ROFR provided in MRT's Tariff.
Pursuant to Section 15.8, GT&C of MRT's Tariff,
the parties have agreed to an extension of the
term with respect to all of the capacity previously
committed under this Agreement.
Rate Zone Capacity
Field 6,173 Dth/D
On any day MRT shall not be obligated to receive or
deliver a cumulative quantity in excess of the MDQ
set forth in this Agreement.
Such service by MRT shall be offered during the
time period from May 1 through October 31 only.