TSP: 006968077 TSP Name: ENABLE MISSISSIPPI RIVER TRANSMISSION, LLC Critical Notice Description: Not a critical notice Notice Effective Date: 03/13/2024 Notice Effective Time: 09:50 Notice End Date: 00/00/0000 Notice End Time: 00:00 Notice Identifier: 4856 Notice Status Description: Initiate Notice Type: Planned Service Outage Posting Date/Time: 03/13/2024 10:03 Required Response Indicator Description: No response required Response Date: Response Time: Subject: PLANNED SERVICE OUTAGES Notice Text: Revision Start Date End Date Prev Start D Prev End Date MRT Location Line Maintenance Potential SPW N 1/1/2024 5/31/2024 11/1/2023 2/1/2024 Ft Hill Station Unit 7 Ft Hill / Westli Compressor Overhaul 1 N/A N 1/4/2024 5/1/2024 11/1/2023 2/1/2024 Unionville Storage Unit 1 Ft Hill / Westli Compressor Overhaul 1 N/A N 1/29/2024 3/31/2024 Ft Hill Station Units 1, 3, 5 Ft Hill / Westli Power Head Replacements 1 N/A N 3/4/2024 3/29/2024 East 100 Line East 100 Line Stopple bypass / line segment replacement 1 N/A N 3/28/2024 3/29/2024 Perryville Turbine Perryville Hub Annual Maintenance 1 5579 N 4/2/2024 4/12/2024 Mainline 1 (Meramac River Crossings) Mainline 1 Hydrostatic Testing 1 N/A N 10/1/2024 10/31/2024 Twelve Mile Station Mainline 2, 3 Unit 6 Regrout 3 N/A N 4/16/2024 4/22/2024 Mainline 2 (Black River to Black River Mainline 2 Cleaning Pigs 1 N/A N 5/14/2024 5/16/2024 Mainline 2 (Black River to Black River Mainline 2 Integrity Pigging Project(GEO and MFL Tools) 1 N/A N 5/20/2024 5/31/2024 Unionville Storage Ft Hill / Westli EOS Spring Shut In 3 Required 1. No capacity impact is expected at this time. 2. Coordinating with necessary loads. 3. Based on historical and current throughput, no capacity impact is expected. In the event nominations increase significantly, restrictions may become necessary. 4. Coordinating maintenance with interconnecting pipe to minimize customer impact. No capacity impact is expected at this time; however, if operating conditions change, affected parties will be notified. 5. Affected production notified of shut-in during work. 6. Customers may experience pressure fluctuations, but no capacity impact is anticipated. 7. Based upon customer nominations, restrictions may become necessary. 8. Based on all available information, capacity will be impacted. Capacity reductions will be done in accordance with the provisions of EGT's tariff regarding scheduling and interruption of services. For a more readable version of this document click Here