Date Requested: May 05 2024 5:39 AM

GR Transactional Reporting Firm

TSP Name: Gulf Run Transmission, LLC (TSP: 118760527)

Gas Day: 04/25/2024

Posting Date Posting Time Svc Req K Rate Sch K Begin Date K End Date K Ent Begin Date/Time K Ent End Date/Time K Qty-K Loc / QTI K Stat K Holder K Holder Name Affil Res Rate ID Max Tariff Res Rate Res Rate Charged Com Rate ID Max Tariff Com Rate Com Rate Charged Negotiated Rate Indicator Terms/Notes Rec Loc Rec Loc Ind Rec Loc Zn Rec Loc Name Del Loc Del Loc Ind Del Loc Zn Del Loc Name
04/01/2024 12:30PM 20011 FTS 01/01/2023 03/31/2026 01/01/2023 09:00AM 04/01/2026 09:00AM 170,000 3 A 872670161 Enable Gas Transmission, LLC TSP RES 0.104100 0.100000 COM 0.002000 0.002000 No 291856 I Z1 EGT Delhi 13548 I Z1 CGT GR
04/01/2024 12:30PM 20011 FTS 01/01/2023 03/31/2026 01/01/2023 09:00AM 04/01/2026 09:00AM 170,000 3 A 872670161 Enable Gas Transmission, LLC TSP RES 0.104100 0.100000 COM 0.002000 0.002000 No 291856 I Z1 EGT Delhi 3201 I Z1 KN-MEP Header GR
04/01/2024 12:30PM 20011 FTS 01/01/2023 03/31/2026 01/01/2023 09:00AM 04/01/2026 09:00AM 170,000 3 A 872670161 Enable Gas Transmission, LLC TSP RES 0.104100 0.100000 COM 0.002000 0.002000 No 291856 I Z1 EGT Delhi 57580 I Z1 Tenn 800 Header GR
04/01/2024 12:30PM 20011 FTS 01/01/2023 03/31/2026 01/01/2023 09:00AM 04/01/2026 09:00AM 170,000 3 A 872670161 Enable Gas Transmission, LLC TSP RES 0.104100 0.100000 COM 0.002000 0.002000 No 291856 I Z1 EGT Delhi EGTDEL1 L Z1 EGTDEL1
03/31/2024 12:30PM 20200 FTS 04/01/2023 03/31/2033 04/01/2023 09:00AM 04/01/2033 09:00AM 151,410 3 A 007933062 Trunkline Gas Company, LLC TSP RES 0.000000 0.273100 COM 0.000000 0.004200 Yes 822000 I Z1 ETC HPL to GR 292545 I Z-2 Trunkline @ Vinton
04/01/2024 11:40AM 20200 FTS 04/01/2023 03/31/2033 04/01/2023 09:00AM 04/01/2033 09:00AM 151,410 3 A 007933062 Trunkline Gas Company, LLC TSP RES 0.000000 0.273100 COM 0.000000 0.004200 Yes Effective Date: Originally, April 1, 2023, as amended and restated April 1, 2024, subject to FERC approval
Primary Term End Date: The end of the Day ten (10) years from the beginning of Period 2
Evergreen/Term Extension? No

MDQ (Dth/D):
150,000 + Applicable Fuel (a) Effective Date through the day before the start of Period 2(b) (“Period 1”)
200,000 + Applicable Fuel (a) From the later of the In-Service Date of the South Louisiana Project or April 1, 2025, provided, however, if the South Louisiana Project is not in service before April 1, 2026, then April 1, 2026, and continuing for a period of ten (10) years (“Period 2”) (b)

Transportation Path:
ETC/HPL to GR (Meter #822000) to Trunkline @ Vinton (Meter # 292545)

Transportation Path Capacity Dth/D:
150,000 + Applicable Fuel(a) - Period 1
200,000 + Applicable Fuel(a) - Period 2

Receipt Entitlement(s) (Dth/D) – Carthage Receipt Area
150,000 + Applicable Fuel (a) - Period 1
200,000 + Applicable Fuel (a) - Period 2

Primary Receipt Point(s): ETC HPL to GR (#822000)
Primary Delivery Point(s): Trunkline @ Vinton (#292545)

Maximum Daily Receipt Obligation*/Maximum Daily Delivery Obligation**:
150,000 Dth/D + Applicable Fuel (a) – Period 1
200,000 Dth/D + Applicable Fuel (a) – Period 2

Negotiated Rate
Reservation Charge: $0.2731
Usage-1 Rate: $0.0042

(a) Applicable Fuel shall be the applicable effective Fuel Reimbursement as stated in Trunkline Gas Company, LLC’s Tariff for Field Zone Only.
(b)The In-Service Date of the South Louisiana Project shall be the first (1st) day of the calendar month following the day on which firm service from primary points of receipt to primary points of delivery is available on Florida Gas Transmission, LLC’s South Louisiana Project.

*The aggregate of all the MDRO’s may not exceed MDQ.
** The aggregate of all the MDDOs may not exceed MDQ.

Authorized Overrun: Unless Transporter agrees otherwise, the rate for any authorized overrun quantities shall be the greater of the maximum Tariff rate or the rate(s) described above or on any designated Attachment.
822000 I Z1 ETC HPL to GR 292545 I Z-2 Trunkline @ Vinton

Posting Date - Posting Date

Posting Time - Posting Time

Svc Req K - Service Requester Contract Number

Rate Sch - Rate Schedule

K Begin Date - Contract Begin Date

K End Date - Contract End Date

K Ent Begin Date/Time - Contract Entered Begin Date/Time

K Ent End Date/Time - Contract Entered End Date/Time

K Qty-K - Contractual Quantity - Contract

Loc / QTI - Location Quantity Type Indicator
3 - Receipt point(s) to delivery point(s)
6 - Storage

K Stat - Contract Status
A - Amended
N - New

K Holder - Contract Holder DUNS Number

K Holder Name - Contract Holder Name

Affil - Affiliate Indicator

Res Rate ID - Reservation Rate Identification Code
100 - Capacity - Field
101 - Capacity - Market
102 - Deliverability - Field
103 - Deliverability - Market
RES - Reservation

Max Tariff Res Rate - Maximum Tariff Reservation Rate

Res Rate Charged - Reservation Rate Charged

Com Rate ID - Commodity Rate Identification Code
135 - Storage Charge - Injection
137 - Storage Charge - Withdrawal
COM - Commodity

Max Tariff Com Rate - Maximum Tariff Commodity Rate

Com Rate Charged - Commodity Rate Charged

Negotiated Rate Indicator - Negotiated Rate Indicator

Terms/Notes - Special Terms & Miscellaneous Notes

Rec Loc - Receipt Location

Rec Loc Ind - Receipt Location Indicator
A - All Locations
L - Location List
I - Individual Location(s)

Rec Loc Zn - Receipt Location Zone

Rec Loc Name - Receipt Location Name

Del Loc - Delivery Location

Del Loc Ind - Delivery Location Indicator
A - All Locations
L - Location List
I - Individual Location(s)

Del Loc Zn - Delivery Location Zone

Del Loc Name - Delivery Location Name