TSP Name: ENABLE GAS TRANSMISSION, LLC
TSP: 87-267-0161
Amend Rptg Desc: Changes Only
Post Date: 10/21/2025 Post Time: 1523485
K Holder Name: NEXTERA ENERGY MARKETING LLC
K Holder: 054 48 1341
Affil Desc: NONE
K Stat: A
Tracking No: 0053027
Svc Req K: 1010008
IT Qty - K: 0
K Roll: Y
K Beg Date 6/1/2015
K End Date 6/30/2015
Rate Sch: IT
Rpt Lvl Desc: Point
Max Rate Beg Date: 0/0/0
Max Rate End Date: 0/0/0
IT Loc Purp
Loc Ind Desc Loc Zn Loc Loc Name Qty - Loc Desc
---------------------- ------- ------ ------------------------- ------- -------
Individual Location(s) Neutral 013896 NEUTRAL POOLING AREA 105000 Receipt Location
Individual Location(s) West 2 302017 EOIT HUGHES CO (DEL) 55000 Delivery Location
Individual Location(s) West 1 003068 PEPL @ CUSTER DEL 50000 Delivery Location
Rate
Rate Chgd Max Trf Max Trf Rate Ngtd Rate Mkt Based
Chgd Ref Rate Ref Desc Ind Desc Rate Ind
--------- --- ------- -------------- --------- ---------
00.160000 DIS 0.2201 Tariff No No
Disc Beg Date: 10 22 2025
Disc End Date: 10 22 2025
Loc/QTI Desc: Receipt point(s) to delivery point(s) quantity
Rate ID Desc: Commodity
Surchg ID Desc: Compressor Usage Surcharge
Surchg Ind Desc: Rate(s) stated do not include any applicable surcharges; surcharge detail and surcharge total provided
Tot Surchg: 0.00280
Terms/Notes:
Contract Holder shall also provide and or pay, as applicable, Fuel Use
and LUFG allowances and charges, including, but not limited to,
surcharges as provided in Tariff.
If specific Pooling Area Pools are indicated as Receipt Locations,
the reference is to all generally available Pools and Additional
Individual Receipt Points in such Pooling Area.
The Rate Chgd herein apply only to the services described above,
including without limitation, the quantities, locations, and terms
stated above; all other services will be provided at maximum Tariff
rates, including any applicable Fuel Use, LUFG and surcharges.
EPC (CUS) Surcharge shall be applicable except as otherwise provided in
Tariff.
This is an intraday transaction.
Compressor Usage Surcharge (CUS), if applicable, is subject to change
semi-annually and/or subject to FERC approval.