EGT Transactional Reporting: Interruptible


 TSP Name:        ENABLE GAS TRANSMISSION, LLC
 TSP:             87-267-0161
 Amend Rptg Desc: Changes Only
 Post Date:       10/30/2023 Post Time: 0703009
 K Holder Name:   ORION PIPELINE, LTD
 K Holder:        079 69 9839
 Affil Desc:      NONE
 K Stat:          A
 Tracking No:     0051845
 Svc Req K:       1008231
 IT Qty - K:              0
 K Roll:          Y

 K Beg Date       10/1/2010
 K End Date       10/31/2010

 Rate Sch:        IT
 Rpt Lvl Desc:    Point



 Max Rate Beg Date: 0/0/0
 Max Rate End Date: 0/0/0


                                                                              IT     Loc Purp
               Loc Ind Desc      Loc Zn   Loc   Loc Name                   Qty - Loc   Desc
          ---------------------- ------- ------ -------------------------   -------   -------
          Individual Location(s) CP      220091 EMP DASTO LINE CP-3            5000   Receipt Location
          Individual Location(s) CP      292279 GULF RUN @ CP-3 TO ST-1        5000   Delivery Location

                    Rate
            Rate    Chgd  Max Trf  Max Trf Rate  Ngtd Rate Mkt Based
            Chgd    Ref    Rate     Ref Desc     Ind Desc  Rate Ind
          --------- ---   ------- -------------- --------- ---------
          00.070000 DIS   0.2201  Tariff           No        No


          Disc Beg Date:   11 1  2023
          Disc End Date:   11 30 2023
          Loc/QTI Desc:    Receipt point(s) to delivery point(s) quantity
          Rate ID Desc:    Commodity
          Surchg ID Desc:
          Surchg Ind Desc: Rate(s) stated include only rates; no surcharges applicable
          Tot Surchg:
  Terms/Notes:
  Contract Holder shall also provide and or pay, as applicable, Fuel Use
  and LUFG allowances and charges, including, but not limited to,
  surcharges as provided in Tariff.
  If specific Pooling Area Pools are indicated as Receipt Locations,
  the reference is to all generally available Pools and Additional
  Individual Receipt Points in such Pooling Area.
  The Rate Chgd herein apply only to the services described above,
  including without limitation, the quantities, locations, and terms
  stated above; all other services will be provided at maximum Tariff
  rates, including any applicable Fuel Use, LUFG and surcharges.
  EPC (CUS) Surcharge shall be applicable except as otherwise provided in
  Tariff.
  Compressor Usage Surcharge (CUS), if applicable, is subject to change
  semi-annually and/or subject to FERC approval.