TSP: 872670161 TSP Name: ENABLE GAS TRANSMISSION, LLC Critical Notice Description: Not a critical notice Notice Effective Date: 11/23/2024 Notice Effective Time: 09:00 Notice End Date: 00/00/0000 Notice End Time: 00:00 Notice Identifier: 5848 Notice Status Description: Initiate Notice Type: TSP Capacity Offering Posting Date/Time: 11/21/2024 07:58 Required Response Indicator Description: No response required Response Date: Response Time: Subject: EGT OP PLAN 11.23-25.24 Notice Text: Enable Gas Transmission, LLC (EGT) Operating Plan Gas Day(s): 11/23-25/2024 Posting Date: Thursday, November 21, 2024 EGT Marketing Rep: Office: Cell: E-mail: ICE IM: Daniel Pena 713-989-7956 713-301-6570 Daniel.Pena@energytransfer.com dpena Notices or Major Changes For more detailed information on the Notices, please see our website: https://pipelines.energytransfer.com/ipost/EGT Notice No. Type Subject Start End 5669 Critical Line BT-1 Force Majeure 10/4/2023 TBD 5839 Critical Notice of FMJ From EOIT 11/13/2024 TBD Note: Due to operational restrictions, the following delivery points may be limited to Primary Firm only: MP. 801535 Trunkline Richland Perryville, MP 802401 ANR Perryville MP. 898401 Sesh FM-65 Core, MP 805092 CGT PV Core Delivery, MP 801537 GSPL W Monroe, MP 805094 Sonat PV, MP 3087 Tenn 100, MP 801642 TETCO W Monroe, MP 801532 TGT PV Note: EGT has limited displacement capacity from West 1, West 2, Neutral (Flex), North, and South points. Displacement capacity will be evaluated on a day-to-day basis. Note: Due to high utilization, EGT has limited capacity for IT and Secondary services from West 1, West 2, Neutral (Flex) and North Pools to The Perryville Hub and other South Pool deliveries. Shippers should nominate in accordance with their contractual rights. EGT Estimated Available Capacity (DTH) Based on current conditions, EGT estimates that the following incremental firm and/or interruptible capacity may be available for the gas day(s) specified above. However, conditions are likely to change, resulting in less or more of such capacity actually being available. In the event that, prior to the applicable nomination deadline, EGT becomes aware that significantly more capacity may be available for the time period specified above, EGT will revise this posting. The actual amount of capacity available at any point will depend on the exact location of the receipt and delivery points nominated by the requesting shipper, as well as current system-wide operations and receipts and deliveries at other locations. Delivery Segment Delivery Pooling Area Available DeliveryPossible Receipt Points Possible Delivery Points AD West West 1 250,000 West 1 West 1 Line AC Delivery South 0 Neutral (Flex) North NGPL Hot Springs, MRT Glendale Quad Line OM-1 Delivery North 0 Neutral (Flex) North AWG, Southern Star Quad Line J & JM-1 Delivery North 0 Neutral (Flex) North TETCO Bald Knob, TGT Searcy, MRT Olyphant Quad BT-1 Delivery North 0 Neutral (Flex) North North Pool Deliveries Perryville Delivery South 0 West 2 (East of Allen) Perryville Hub Perryville Delivery South 0 Neutral (East of Chandler), North Perryville Hub Perryville Delivery South 22,000 South Perryville Hub Perryville Hub Trading Point 0 Neutral (Flex), North, South Receipt Points Perryville Hub Trading Point 0 Perryville Hub Trading Point Neutral (Flex), North Delivery Points 0 Perryville Hub Trading Point Line CP Delivery Points 0 Line CP Receipt Points Perryville Hub Trading Point For points not shown above and/or other transportation requests, please contact your EGT Marketing representative. Please see Operationally Available Receipt/Delivery and "Unsubscribed Receipt/Delivery" information on EGT s EBB for more information regarding these points and other points not listed above. Perryville Hub firm wheeling services may also be available between hub points. Please contact your Marketing Representative. PALS - Park, Loans, NBS, and Hourly Shaping Estimated Availability (DTH) Location Parks Loans Hourly Shaping Per Area - Park & Loan Service EGT System Wide Total 0 0 Case by Case Basis West 1 Limitations 0 0 0 West 2 Limitations 0 0 0 Neutral (Flex) Limitations 25,000 0 Case by Case Basis North Limitations 0 0 Case by Case Basis South Limitations 0 0 Case by Case Basis Interruptible Pool Transfer Capacity (DTH) - Estimated The Pool Transfer Capacity listed below is a subset of the EGT Estimated Available Capacity specified above. Nominations will be scheduled in accordance with the provisions of EGT's Tariff. Nominations for interruptible services are prioritized based on total economic value. From West 1 From W2 From Neutral ( From South From North From Line CP To West 1 N/A 0 0 0 0 0 To West 2 0 N/A 0 0 0 0 To Neutral 0 0 N/A 0 0 0 To South 0 0 0 N/A 0 0 To North 0 0 0 0 N/A 0 Current EGT Hourly Tolerance Levels EGT Quad Area 10% Line J 0% Line AC 10% Perryville Hub All PVH Interconnections 0% East Texas/North Louisiana Area 10% Shippers interested in System Management gas purchases or sales please contact Daniel Pena at 713-301-6570 or email Daniel.Pena@energytransfer.com For a more readable version of this document click Here