TSP: 872670161 TSP Name: ENABLE GAS TRANSMISSION, LLC Critical Notice Description: Not a critical notice Notice Effective Date: 10/14/2022 Notice Effective Time: 11:05 Notice End Date: 00/00/0000 Notice End Time: 00:00 Notice Identifier: 5071 Notice Status Description: Initiate Notice Type: Planned Service Outage Posting Date/Time: 10/14/2022 10:15 Required Response Indicator Description: No response required Response Date: Response Time: Subject: PLANNED SERVICE OUTAGES Notice Text: Revision Start Date End Date Prev Start DaPrev End Da Line / Facility Pooling Area Line Maintenance Potential Im O/A or News Y 8/13/2022 10/18/2022 8/13/2022 10/12/2022 Line OT-13 North Line OT-13 Dehydrator Repairs 2 N/A N 9/15/2022 1/1/2023 Westdale Station CP Line CP Westdale Station Project Outage (Gulf Run) 3 N/A Y 9/12/2022 11/14/2022 9/20/2022 10/14/2022 Dunn Station North Line J Unit 3 / Compressor Overhaul 1 TBD N 9/13/2022 10/31/2022 Chandler Station West Line AD Unit 1 / Cylinder liner 1 TBD N 9/27/2022 11/9/2022 Waskom Monument Meter 031 South Line ST-1 Reverse flow project modifications 1 N/A Y TBD (Oct) TBD (Oct) TBD (Sept) TBD (Sept) Vernon Station CP Line CP Hot Tap 3 TBD N 10/1/2022 12/31/2022 Line CP / Gemini IC CP Line CP Hot Tap / Measurement Upgrades 1 TBD N 10/6/2022 10/17/2022 Malvern Station Nuetral Line AC Unit 3 Oil Heater Pump Replacement 1 N/A N 10/10/2022 10/28/2022 Pine Pipeline South Pine Pipeline Integrity dig assessments 1 N/A N 10/17/2022 11/11/2022 Malvern Station Nuetral Line AC Units 2, 3, 4 ( Annual Maintenance) 1 N/A N 10/11/2022 10/12/2022 Vernon Station CP Line CP Strainer removals 4 Required N 10/12/2022 10/12/2022 Byars Lake Station West Line AD Unit 2 Turbo Exhaust Leak Repairs 1 N/A N 10/12/2022 10/12/2022 Line FM-63A South Line FM-63A Cleaning pig 1 N/A N 10/17/2022 10/21/2022 Line OM-1 North Line OM-1 Integrity dig assessments 3 Required Y 10/18/2022 10/28/2022 10/17/2022 10/28/2022 Ruston Compressor South Line F Compressor Maintenance 3 TBD N 10/18/2022 10/18/2022 Line A South Line A Pressure testing project 7 Required N 10/24/2022 10/24/2022 Line SM-1 South Line SM-1 Pressure testing project 1 N/A Y Oct / Nov TBD Oct / Nov TBD 10/24/2022 10/28/2022 Line AM-50 South Line AM-50 Pressure testing project 4 TBD N 10/24/2022 10/25/2022 Line OM-1 North Line OM-1 Hot tap / New IC 1 N/A Y 10/26/2022 10/26/2022 10/1/2022 10/15/2022 Line AD / Chandler Station Nuetral Line AD/AC Chandler Station Suction Control Project 7 Required N 10/31/2022 10/31/2022 Line F (Buckley to Red Chute / Red Chut South Line F Cleaning Pig runs 3 N/A N 11/1/2022 11/3/2022 Alto Station CP Line CP Borescope / Annual Maintenance 7 TBD N 11/1/2022 11/1/2022 Line F (Ruston to Six Mile) South Line F Cleaning Pig run 3 N/A N 11/2/2022 11/2/2022 Line F to FT-18 South Line F Cleaning Pig run 3 N/A Y 11/1/2022 11/5/2022 Allen Station West Line AD Semi Annual Turbine Maintenance / Bi directional flow project 8 Required N 11/1/2022 11/1/2022 Line LIT-19 South Line LIT-1 Hot Tap Proceedure 1 N/A N 11/2/2022 11/2/2022 Line S-3-S (Bierne to Magnolia) South Line S-3-S Cleaning Pig 1 N/A N 11/3/2022 11/4/2022 Line S South Line S Cleaning Pig runs 1 N/A Y 11/7/2022 11/11/2022 9/12/2022 9/19/2022 Chandler Station West Line AD Unit 2 / Turbos 7 Required N 11/8/2022 11/12/2022 Buckley Station South Line F Relief valves, panel board, actuator replacements 3 TBD N 11/8/2022 11/15/2022 Ada Storage Neutral Line AD EOS Shut In 7 Required Y 11/14/2022 12/14/2022 9/27/2022 10/25/2022 Chandler Station Neutral Line AD Unit 3 / Turbos 3 N/A N 11/15/2022 11/22/2022 Chiles Dome Storage Neutral Line 2AD EOS Shut In 7 Required N 12/6/2022 12/7/2022 Line ST-10 South Line ST-10 Cleaning Pig runs 3 N/A N 12/12/2022 12/15/2022 Line BT-1 / BT-1-B / Jessieville to Per North Line BT-1 Integrity Pigging Project (MFLC and EMAT) 4 TBD Y TBD (Dec) TBD (Feb) 4/4/2022 5/4/2022 Line T (Perla to Stuttgart) North Line T Integrity Pigging Project 2 TBD N TBD/2023 TBD/2023 Line JM-1 North Line JM-1 Pig Launcher valve replacement 1 N/A N TBD / Spring 2023 TBD / Spring 2023 Kiowa Plant Neutral ADT-27 Ultrasonic Measurement Upgrades 1 N/A Y TBD / APR 2023 TBD/ APR 2023 3/8/2022 3/31/2022 Line JM-1(Denmark to Helena) North Line JM-1 Integrity Pigging Project 1 TBD N TBD / 2023 TBD/2023 Line A (Price Road to Rineco Plant) South Line A Integrity Pigging Project (Tether Tool) 7 TBD 1. No capacity impact is expected at this time. 2. Coordinating with necessary loads. 3. Based on historical and current throughput, no capacity impact is expected. In the event nominations increase significantly, restrictions may become necessary. 4. Coordinating maintenance with interconnecting pipe to minimize customer impact. No capacity impact is expected at this time; however, if operating conditions change, affected parties will be notified. 5. Affected production notified of shut-in during work. 6. Customers may experience pressure fluctuations, but no capacity impact is anticipated. 7. Based upon customer nominations, restrictions may become necessary. 8. Based on all available information, capacity will be impacted. Capacity reductions will be done in accordance with the provisions of EGT's tariff regarding scheduling and interruption of services. For a more readable version of this document click Here