TSP: 872670161
TSP Name: ENABLE GAS TRANSMISSION, LLC
Critical Notice Description: Not a critical notice
Notice Effective Date: 05/16/2022
Notice Effective Time: 06:35
Notice End Date: 00/00/0000
Notice End Time: 00:00
Notice Identifier: 4900
Notice Status Description: Initiate
Notice Type: TSP Capacity Offering
Posting Date/Time: 05/16/2022 06:42
Required Response Indicator Description: No response required
Response Date:
Response Time:
Subject: EGT OP PLAN 05.17.22
Notice Text:
Enable Gas Transmission, LLC (EGT) Operating Plan
Gas Day(s): 05/17/22 Posting Date: Monday, May 16, 2022
EGT Marketing Rep: Office: Cell: E-mail: ICE IM:
Daniel Pena 346-701-2163 713-301-6570 Daniel.Pena@energytransfer.com dpena
Notices or Major Changes
For more detailed information on the Notices, please see our website: http://pipelines.enablemidstream.com/EGT.html
Notice No. Type Subject Start End
4810 Critical Line KT-1 Maintenance 9/8/2021 8/1/2022
4836 Critical Chandler Compressor Maintenance #2 4/25/2022 5/26/2022
4895 Critical EGT Vernon Station CP Outage 6/1/2022 8/31/2022
4897 Critical EGT Line OM-1 Cleaning Pig Run 5/25/2022 5/25/2022
Note: Due to operational restrictions, the following delivery points may be limited to Primary Firm only: MP. 801535 Trunkline Richland Perryville, MP 802401 ANR Perryville, MP 808762 Acadian Red River,
MP. 898401 Sesh FM-65 Core, MP 805092 CGT PV Core Delivery, MP 801537 GSPL W Monroe, MP 805094 Sonat PV, MP 3087 Tenn 100, MP 801642 TETCO W Monroe, MP 801532 TGT PV, MP 822091 Arcadia IC CP Del, and MP 57580 Tenn 800
Note: EGT has limited displacement capacity from West 1, West 2, Neutral (Flex), North, and South points and/or pools to Line CP Pools and/or points. Displacement capacity will be evaluated on
Note: Due to high utilization, EGT has limited capacity for IT and Secondary services from West 1, West 2, Neutral (Flex) and North Pools to The Perryville Hub and other South Pool deliveries.
Shippers should nominate in accordance with their contractual rights.
EGT Estimated Available Capacity (DTH)
Based on current conditions, EGT estimates that the following incremental firm and/or interruptible capacity may be available for the gas day(s) specified above.
However, conditions are likely to change, resulting in less or more of such capacity actually being available. In the event that, prior to the applicable nomination deadline, EGT becomes aware that significantly more
capacity may be available for the time period specified above, EGT will revise this posting. The actual amount of capacity available at any point will depend on the exact location of the receipt and delivery points
nominated by the requesting shipper, as well as current system-wide operations and receipts and deliveries at other locations.
Delivery Segment Delivery Pooling Area Available DeliveryPossible Receipt Points Possible Delivery Points
AD West West 1 150,000 West 1 West 1
Line AC Delivery South 100,000 Neutral (Flex) North NGPL Hot Springs, MRT Glendale
Quad Line OM-1 Delivery 30,000 Neutral (Flex) North AWG, Southern Star
Quad Line J & JM-1 Delivery North 50,000 Neutral (Flex) North TETCO Bald Knob, TGT Searcy, MRT Olyphant
Quad BT-1 Delivery North 50,000 Neutral (Flex) North North Pool Deliveries
Perryville Delivery South 0 West 2 Perryville Hub
Perryville Delivery South 97,500 Neutral (East of Chandler), North Perryville Hub
Perryville Delivery South 70,000 South Perryville Hub
Perryville Hub Trading Point 0 Neutral (Flex), North, South Receipt Points Perryville Hub Trading Point
0 Perryville Hub Trading Point Neutral (Flex), North Delivery Points
0 Perryville Hub Trading Point Line CP Delivery Points
0 Line CP Receipt Points Perryville Hub Trading Point
Line CP Delivery Line CP 573,000 There is no Displacement Available from Core to Line CP Line CP Supply Only CP Delivery Points, Core Delivery Points
For points not shown above and/or other transportation requests, please contact your EGT Marketing representative.
Please see Operationally Available Receipt/Delivery and "Unsubscribed Receipt/Delivery" information on EGT s EBB for more information regarding these points and other points not listed above.
Perryville Hub firm wheeling services may also be available between hub points. Please contact your Marketing Representative.
PALS - Park, Loans, NBS, and Hourly Shaping Estimated Availability (DTH)
Location Parks Loans Hourly Shaping Per Area - Park & Loan Service
EGT System Wide Total 0 0 Case by Case Basis
West 1 Limitations 0 0 0
West 2 Limitations 0 0 0
Neutral (Flex) Limitations 25,000 0 Case by Case Basis
North Limitations 0 0 Case by Case Basis
South Limitations 0 0 Case by Case Basis
Line CP Limitations 0 0 0
Interruptible Pool Transfer Capacity (DTH) - Estimated
The Pool Transfer Capacity listed below is a subset of the EGT Estimated Available Capacity specified above. Nominations will be scheduled in accordance with the provisions of EGT's Tariff. Nominations for
interruptible services are prioritized based on total economic value.
From West 1 From W2 From Neutral ( From South From North From Line CP
To West 1 N/A 0 0 0 0 0
To West 2 0 N/A 0 0 0 0
To Neutral 0 0 N/A 0 0 0
To South 0 0 0 N/A 0 0
To North 0 0 0 0 N/A 0
To Line CP 0 0 0 0 0 N/A
Current EGT Hourly Tolerance Levels
EGT Quad Area 10%
Line J 0%
Line AC 10%
Perryville Hub All PVH Interconnections 0%
East Texas/North Louisiana Area 10%
Line CP 0%
Shippers interested in System Management gas purchases or sales please contact Amy Morris at 405.553.6474 or email Amy.Morris@EnableMidstream.com
For a more readable version of this document click Here