TSP: 872670161 TSP Name: ENABLE GAS TRANSMISSION, LLC Critical Notice Description: Not a critical notice Notice Effective Date: 05/14/2022 Notice Effective Time: 07:45 Notice End Date: 00/00/0000 Notice End Time: 00:00 Notice Identifier: 4899 Notice Status Description: Initiate Notice Type: Planned Service Outage Posting Date/Time: 05/14/2022 07:42 Required Response Indicator Description: No response required Response Date: Response Time: Subject: PLANNED SERVICE OUTAGES Notice Text: Revision Start Date End Date Prev Start DaPrev End Da Line / Facility Pooling Area Line Maintenance Potential Impa Y 9/24/2021 TBD 10/7/2021 Line A South Line A Leak repairs / weld over sleeves (2) 1 Y 12/19/2021 7/31/2022 12/19/2021 5/20/2022 Malvern Station North Line AC Unit 1 cylinder liner repairs 1 Y 4/18/2022 5/11/2022 4/18/2022 4/22/2022 Line J (Cache River) North Line J replacement of two eight inch valves 1 N 4/25/2022 5/25/2022 Chandler Station Unit 2 Neutral Line AD Annual Maintenance/ Pistons, Cylinder Liners (3) 7 N 4/25/2022 5/27/2022 Cove Station Nuetral Line AC Turbine swingout for aft hub replacement 1 N 5/1/2022 TBD Ada Storage West Line 1AD Data results timeline projection 1 Y 5/9/2022 5/13/2022 5/2/2022 5/6/2022 Amber Station West Line AD Unit 2 / Annual Maintenance 1 N 5/9/2022 5/13/2022 Byars Lake Station West Line AD Unit 2 / C Service, heads, turbos 8 Y 5/17/2022 6/13/2022 5/17/2022 6/1/2022 Line S-3-S (Perla to Bierne) Neutral Line S-3-S Integrity Pigging Project 1 N 5/25/2022 5/25/2022 Line OM-1 (Jane to Dunn) North Line OM-1 Cleaning Pig Run(s) Prep for MFL Pig 8 N 5/24/2022 5/25/2022 Line LIM-1 South Line LIM-1 Cleaning pig runs with Air 8 N 5/31/2022 5/31/2022 Amber Station West Line AD Unit 4 Quad Z Emissions Testing 1 N TBD (May) TBD (May) Line 2 South (BOL to Custer) West Line 2 South Cleaning pig run 1 N TBD (June) TBD (June) Line OM-1 North Line OM-1 Cleaning Pig Run(s) Prep for MFL Pig 8 N 6/1/2022 8/31/2022 Vernon Station CP Line CP Vernon Station Project Outage (Gulf Run) 7 N 7/5/2022 7/9/2022 Panola Station CP Line CP Unit 2 Replacement 1 N 7/11/2022 7/30/2022 Delhi LA / CP-4 CP Line CP Inline Separator Installation Project 3 N 7/12/2022 7/16/2022 Line CP / CGT CP Line CP Bidirectional Flow Project 7 N 7/12/2022 7/12/2022 Line OM-1 North Line OM-1 MFL Pig 8 N Aug TBD Aug TBD Westdale Station CP Line CP Westdale Station Project Outage (Gulf Run) 3 N TBD (Sept) TBD (Sept) Line O / Chandler to Dunn Nuetral Line O Cleaning Pig Run 3 N Sept / Oct TBD Sept / Oct TBD Allen Station West Line AD Semi Annual Turbine Maintenance 8 N 9/12/2022 9/15/2022 Line A / Price Rd to Rineco Plt South Line A Tether Pig Project 1 N 9/12/2022 9/19/2022 Chandler Station Unit 2 Neutral Line AD Turbo Replacements 7 Y 9/20/2022 10/14/2022 5/16/2022 6/3/2022 Dunn Station North Line J Unit 3 / Turbos, water pumps 1 N Fall TBD Fall TBD Kiowa Plant Neutral ADT-27 Ultrasonic Measurement Upgrades 1 N 12/13/2022 12/15/2022 Line BT-1 / BT-1-B / Jessieville to Perla North Line BT-1 Integrity Pigging Project 4 Y TBD (Feb) TBD (Feb) 4/4/2022 5/4/2022 Line T (Perla to Stuttgart) North Line T Integrity Pigging Project 2 N TBD/2023 TBD/2023 Line JM-1 North Line JM-1 Pig Launcher valve replacement 1 Y TBD / APR 2023 TBD/ APR 2023 3/8/2022 3/31/2022 Line JM-1(Denmark to Helena) North Line JM-1 Integrity Pigging Project 1 1. No capacity impact is expected at this time. 2. Coordinating with necessary loads. 3. Based on historical and current throughput, no capacity impact is expected. In the event nominations increase significantly, restrictions may become necessary. 4. Coordinating maintenance with interconnecting pipe to minimize customer impact. No capacity impact is expected at this time; however, if operating conditions change, affected parties will be notified. 5. Affected production notified of shut-in during work. 6. Customers may experience pressure fluctuations, but no capacity impact is anticipated. 7. Based upon customer nominations, restrictions may become necessary. 8. Based on all available information, capacity will be impacted. Capacity reductions will be done in accordance with the provisions of EGT's tariff regarding scheduling and interruption of services. For a more readable version of this document click Here